Documents

October 2016

Duben West 95% Plans

February 2015

Duben West 65% Plans

Duben East 65% Plans

September 2014 - Final Design Study Report

Duben Avenue Upgrades Final Design Study Report

Appendix A - Roadway & Profile Drawings

Appendix B - Storm Drain Plan & Profile Drawings

Appendix C - Existing Utilities Drawings

Appendix D - Traffic Data & Reports

Appendix E - Storm Drain Modeling Data

Appendix F - Storm Drain Inspection Report

Appendix G - On-Street Parking Study

Appendix H - Easement Spreadsheets & Existing ROW Maps

Appendix I - Project Cost Estimates

Appendix J - Public Involvement

Appendix K - Geotechnical Report

Appendix L - CRW/MOA Traffic/PM&E Meeting Report

Appendix M - Draft DSR Review Comments & Responses

January 2014 - Draft Design Study Report

Duben Avenue Upgrades Draft Design Study Report

Appendix A - Roadway Plan & Profile

Appendix B - Storm Drain Plan & Profile

Appendix C - Existing Utility Drawings

Appendix D - Traffic Data & Reports

Appendix E - Storm Drain Modeling Data

Appendix F - Storm Drain Inspection Report

Appendix G - On-Street Parking Study

Appendix H - Easement Spreadsheets & Existing ROW Maps

Appendix I - Project Cost Estimates

Appendix J - Public Involvement

Appendix K - Draft Geotechnical Report

Appendix L - Statement of Technical Infeasibility


Mailing List Sign Up